What's the tooling developing procedure in Longxiang?
Golden 24 hours principle
----all the responses should be done within 24 hours!
Step.1 Order
Step.2 DFMEA
Step.3 Tooling BOM Form
Step.4 Tooling 2D Drawing
Step.5 Cutting Tooling Notice
Step.6 Weekly Report
Step.7 Tooling 3D drawing
Step.8 Dimension Report of T1 sample
Step.9 Packing Information
Step.10 CD
Step.11 3000 cycles testing for tooling ejecting system
Step.12 Plastic Mould Operation Manual